Importing from Pretest Room - VisionR 800
Importing from Pretest Room
Related Articles
Guideline | 12 to 28 Feet Exam Room
Guideline | 12 to 28 Feet Exam Room (MIN. QTY 1) power outlets at 60 inches height *** Front of the chair *** MANDATORY (MIN. QTY 1) power outlets at 16 inches height *** behind the chair *** MANDATORY (MIN. QTY 1) network ethernet ports at 16 ...
Guideline | 6 to 11 Feet Exam Room
Guideline | 6 to 11 Feet Exam Room (MIN. QTY 1) power outlets at 16 inches height *** behind the chair *** MANDATORY (MIN. QTY 1) power outlets at 74 inches height *** behind the chair *** MANDATORY (QTY 1) Mirror *** front the chair *** MANDATORY
Head Unit - VisionR 700
Head Unit - VisionR 700
Power Supply - VisionR 800
1. Start-up mode Position 1: turning on the refraction head by pressing on On/Off with the console. Position 2: turning on the phoropter head using the ON/OFF switch on the power supply box. 2. Service technician socket 3. ...
Troubleshooting VisionR 800
During refraction or usage of the device, the keyboard is very slow to react Check the % on the top left corner If it shows less than 40% - Switch the Vision-R system OFF and back ON. Remove fingerprint smudges with a tissue or soft microfiber ...