Importing from Pretest Room - VisionR 800

Importing from Pretest Room - VisionR 800

Importing from Pretest Room
    • Related Articles

    • Guideline | 12 to 28 Feet Exam Room

      Guideline | 12 to 28 Feet Exam Room  (MIN. QTY 1) power outlets at 60 inches height *** Front of the chair *** MANDATORY (MIN. QTY 1) power outlets at 16 inches height *** behind the chair *** MANDATORY (MIN. QTY 1) network ethernet ports at 16 ...
    • Guideline | 6 to 11 Feet Exam Room

      Guideline | 6 to 11 Feet Exam Room  (MIN. QTY 1) power outlets at 16 inches height *** behind the chair *** MANDATORY (MIN. QTY 1) power outlets at 74 inches height *** behind the chair *** MANDATORY (QTY 1) Mirror *** front the chair *** MANDATORY
    • Head Unit - VisionR 700

      Head Unit - VisionR 700
    • Power Supply - VisionR 800

      1. Start-up mode Position 1: turning on the refraction head by pressing on On/Off            with the console. Position 2: turning on the phoropter head using the ON/OFF     switch on the power supply box. 2. Service technician socket    3. ...
    • Troubleshooting VisionR 800

      During refraction or usage of the device, the keyboard is very slow to react  Check the % on the top left corner If it shows less than 40%  - Switch the Vision-R system OFF and back ON. Remove fingerprint smudges with a tissue or soft microfiber ...